Silicone CEILING ROSE MOULD mainly has two parts: bottom box and upper cover. The installation of the ground can be divided into two steps.

1. Installation of the bottom box

First of all, determine the installation location. It is best to choose a more dry space position in the installation location. The bottom box is reliable to connect with the metal wire tube, and the concrete is poured to fix the bottom box.

Second, determine the depth of embedding. Generally speaking, in order to ensure that the upper cover energy is perfectly matched with the ground, the upper end of the bottom box should be 3-5mm below the ground plane. It will not be too prominent to bring potential dangers, nor will it be difficult to use to the ink.

2. Installation on the upper cover

After the concrete is fixed, remove the bottom box protective cover, clean the dust and debris in the box, and clean up the place where there is a gap. Secondly, the anticorrosive coatings are coated around the ground entrance, and the concrete materials around the entrance must be completely dry and then installed.

Because the ground is installed on the ground, it directly contacts the tiles on the ground. If the concrete material that has not been completely dry has been exposed to the metal if it does not have anti -corrosion treatment. After the anticorrosive treatment is performed, the ground box is connected to the ground -lined ground connection. Finally, fix the upper cover.

silicone ceiling rose mould https://www.tangrammould.com/Decorative-Small-Ceiling-Rose-Mould.html